MRD
MRD
  • Home
  • Services
  • Projects
  • About us
  • Reviews
  • More
    • Home
    • Services
    • Projects
    • About us
    • Reviews
Schedule a discovery conversation
  • Home
  • Services
  • Projects
  • About us
  • Reviews
Schedule a discovery conversation

Accessory Dwelling Units (ADU)

ADUs offer a powerful way to expand how your property functions—without compromising design.
At Archrysalis, we design ADUs that are thoughtful, efficient, and beautifully integrated into their surroundings. Whether used for multi-generational living, guest accommodations, rental income, or private workspaces, each unit is tailored to its purpose.
We approach ADUs as complete living environments—not secondary spaces.
Our designs prioritize:

  • Privacy and independence while maintaining connection to the main home
  • Efficient use of space without sacrificing comfort or quality
  • Natural light and openness to create a sense of spaciousness
  • Flexibility for evolving needs over time

An ADU should feel just as intentional as your primary home—because it plays an equally important role in how you live.

GET STARTED

THE ROADMAP

Contact US

Archrysalis PLLC

4117 Park Rd. #11205, Charlotte, NC 28209, USA

Phone: (704) 807-2877 Email: archrysalis@archrysalis.com

Phases

01 Pre Design

______________________________________

  • Client Intake
  • Introductory Consultation / Discovery Call
  • Site Meeting & Existing Conditions Review
  • Proposal & Documentation Request
  • Feasibility Study

    Estimated Time Frame: 2-4 Weeks


02 Schematic Design

______________________________________

  • Preliminary Floor Plan Concepts

    Estimated Time Frame: 3-6 Weeks


03 Design Development

______________________________________

  • Design Refinement
  • Material Specification & Research
  • Consultant Introduction & Coordination
  • Budgeting

    Estimated Time Frame: 4-8 Weeks


04 Construction Documents

_____________________________________

  • Authorization & Retainer
  • Construction Documentation
  • Permitting & City Review
  • Material Procurement

    Estimated Time Frame: 6-10 Weeks


05 Contractor Selection

____________________________________

  • Contractor Pricing & Scheduling
  • Material Procurement
  • Construction Start

    Estimated Time Frame: 2-4 Weeks


06 Construction Observation as Architects

____________________________________

  • Coordination with Contractor & Consultation
  • Project Closeout (if Applicable)


06 Construction as Residential Contractor

____________________________________

  • Pre-construction Planning & Feasibility
  • Budgeting, Estimating & Cost Control
  • Permitting & Code Coordination
  • Site Preparation & Mobilization
  • Full Project Management & Supervision
  • Subcontractor Sourcing & Coordination
  • Scheduling & Timeline Management
  • Construction Execution ( Ground-Up, Additions, Renovations)
  • Quality Control & Inspection
  • Change Order Management
  • Safety Management
  • Punch List & Project Closeout
  • Warranty & Post-Construction Support


    Estimated Time Frame: Duration of Construction


GET STARTED

Copyright © 2026 Archrysalis  - All Rights Reserved.